LEB: On the other side
Posted on July 1, 2008 · Print This Article
Hi, thought it was about time you heard from me about what exactly it is that I’m doing for Last Eyes Blinded. Joz has mentioned a few of the things I’ve been up to, but I’ll let you know a few futher details.
I’ve just sent off the final versions of our marketing materials sent off to the lovely people at EcoPrint, you can find out more about them at ecoprintuk.com, sent an email to the also lovely people at the Salisbury Playhouse Marketing Department who’ve been a great help to us, and will shortly be popping down to Waterstone’s who have allowed us to put up a display in their store in the past but haven’t got back to us about this year. Additionally, this afternoon Joz and I are going to pop to see the Studio Technician, Dave, at the Playhouse to talk about practicalities.
By the end of this week, we hope to have produced our basic lighting design and final schedules for the production week, to make sure that we can have Dave when we need him: that is for the Technical and Dress Rehearsals and most importantly the Performances, as well as finding time to get the lights up, the stage set and so on. We also need to talk to him about whether he needs a second operator in the box or would rather do it alone to prevent overcrowding!
Well, that’s about it. Sorry my posts aren’t as long and interesting as Joz’s, but I expect them to get longer as we get closer to the performances. This week should have quite a bit of admin stuff happening while rehearsals take a short break.
Jake



Comments
Got something to say?